Cable line 110kV PV PP "GALABOVO"
Investor: GALABOVO SOLAR BG EOOD
Contractor: FILKAB AD
Role of ENGINEERING EAD: Subcontractor
Location: Galabovo, Bulgaria
Contract value: BGN 1,850,000. without VAT
Year of implementation: 2023
The activities of the project include the construction of a new 110kV cable line that connects the Galabovo Photovoltaic Power Plant with the power grid of ESO EAD. The length of the 110kV cable line is 3250 meters in total.
6,890 meters of A2XS(FL)2Y 64/110kV 1x1200rm/95 cable manufactured by TFkable Poland were delivered and installed, as well as the necessary cable joints, outdoor cable terminations and GIS cable terminations 110kV manufactured by Raychem Germany, part of the TE Connectivity group . The delivery of the components for the construction of the cable line was carried out by FILKAB AD. As the executor of the contract, FILKAB AD fully undertakes the project management activities, provides supervision of the activities of laying the HV cable and the installation of the relevant cable accessories.
ENGINEERING EAD undertakes the installation of the 110kV cable accessories, part of which was carried out at a height of 25 meters on an steel lattice pole, where the connection is made to the open switchgear of the "Maritsa Iztok" system substation.