Completed projects

Cable line "KIPARIS" 110kV

Investor: ESO EAD
Contractor: DZZD KIPARIS
Role of ENGINEERING EAD: Subcontractor
Location: Stara Zagora, Bulgaria
Contract value: BGN 2,700,000. without VAT
Year of implementation: 2016 – 2019

The activities of the project include the construction of a new 110KV "KIPARIS" cable line from  "ZAGORKA" substation to  "TRAJANA" substation on the territory of the city of Stara Zagora. The length of the cable line is a total of 3100 meters, and the work was carried out entirely in an urban environment.

9300 meters of cable A2XS(FL)2Y 64/110kV 1x1200rms/50 manufactured by Prysmian Romania and the necessary cable joints and outdoor cable terminations 110kV manufactured by Pfisterer Switzerland have been supplied and installed. The delivery of the components for the construction of the cable line was carried out by FILKAB AD. As part of the consortium, contractor FILKAB AD fully undertakes the project management activities, providing supervision of the activities of laying the HV cable and the installation of the relevant cable accessories.

In order to guarantee quality implementation of projects of such complexity, ENGINEERING EAD has the necessary equipment - a pulling machine with effort control, a drum stand with a brake, cable rollers, as well as trained operators.