Completed projects

Cable lines 110kV to "BIOVET" plant Peshtera

Investor: Biovet AD
Contractor: Siemens EOOD
Role of ENGINEERING EAD: Subcontractor
Location: Peshtera, Bulgaria
Contract value: BGN 200,000. without VAT
Year of implementation: 2018 

The activities of the project include the construction of four new 110kV cable lines in connection with the construction of new production facilities of Biovet AD in the town of Peshtera. Cable lines are built from a new 110/6kV substation to two of the 110/6kV power transformers at the existing production site and to two new 110/6kV power transformers at the new production site.

3900 meters of A2XS(FL)2Y 64/110kV 1x400rm/95 cable manufactured by Prysmian Romania were delivered and installed. The cable was delivered by FILKAB AD. 

The pulling of the cable and the installation of the 110kV cable accessories was carried out by ENGINEERING EAD, the company has trained and certified personnel for this. To ensure quality execution of projects of such complexity, the company has the necessary equipment - a pulling machine with effort control, a drum stand with a brake, cable rollers, as well as trained operators. On this project, the company provides supervision of the laying of the HV cable and the installation of the corresponding cable accessories.